History
of Fairbanks
FSS
Facilities and Services |
|
|
|
Fairbanks, Alaska
|
|
|
1/01/40 |
FAA
assumed operation from AA & CC. |
|
|
3/20/40 |
SBRAZ-P-D
commissioned. |
|
|
6/15/40 |
Hours
station operation increased to 16 from 12 hours daily. |
|
|
4/28/41 |
Range
frequency changed from 236 to 260 kc. |
|
|
7/25/42 |
Commenced
use of 5672.5 kc on D453. |
|
|
2/01/43 |
Airport
Control Tower commissioned. |
|
|
11/04/43 |
Circuit
305 commissioned. |
|
|
11/28/43 |
Dual
control range by Ladd Tower and Radio commissioned. |
|
|
1/01/44 |
UHF
System installed and commissioned. |
|
|
2/06/44 |
FAA
facilities using power from CT site and commissioned. Northern commercial
power is stand-by. |
|
|
2/15/44 |
Weeks
Field control tower closed from 10:00 PM to 6:00 AM. |
|
|
3/03/44 |
Circuit
304 commissioned. |
|
|
8/23/44 |
FAA
assumed custodianship and maintenance responsibility of PAA ground
communication equipment at Fairbanks. |
|
|
9/13/44 |
Circuit
372 decommissioned. May use transmitter on present PanAm assignment
temporarily. |
|
|
10/01/44 |
FSS
assumed operation of all PAA communications. |
|
|
10/05/44 |
Circuit
E457 commissioned. |
|
|
10/15/44 |
6537
and 9980 kc commissioned in Collins BC642. 5010 kc shifted to THV and may
be keyed simultaneously with 1618. Two additional receivers installed E457
position. |
|
|
10/28/44 |
ACS
connected to Circuit llOT. |
|
|
11/23/44 |
PAA
private teletype circuit installed connecting FAA, PAA hanger, and
downtown PAA office. |
|
|
1/06/45 |
TLC
transmitter commissioned 189 kc. |
|
|
1/13/45 |
TLC
transmitter commissioned on 139 kc. |
|
|
3/19/45 |
Fairbanks-Whitehorse
Schedule B express circuit commissioned. (Circuit 9390). |
|
|
3/29/45 |
Installation of the lighting
chokes and commissioning of Fairbanks range tower obstruction lighting was
completed. |
|
|
4/16/45 |
Nenana-Fairbanks teletype
installation completed. |
|
|
4/17/45 |
Approach control recommissioned. |
|
|
5/09/45 |
Circuit 302x placed in
inactive status. |
|
|
6/04/45 |
Reperforators installed on
circuit 9880 and local circuit to Weather Bureau. |
|
|
8/21/45 |
Weeks Field Tower
decommissioned. |
|
|
10/08/45 |
Teletype service between ACS
and Fairbanks discontinued. |
|
|
10/17/45 |
CPAL placed on local
teletype circuit. |
|
|
10/24/45 |
CPAL began scheduled
operations, XY‑FX. |
|
|
11/12/45 |
Circuit 804 decommissioned
(Express FX‑XY.) |
|
|
11/12/45 |
Circuit 9390 officially
commissioned. |
|
|
11/16/45 |
Circuit 304 placed in
stand‑by status. |
|
|
1/01/46 |
Station KAZOO discontinued. |
|
|
1/30/46 |
Switching arrangement
installed to interconnect circuits 801T and 9390. |
|
|
3/05/46 |
Drop on 9892T installed at PAA. |
|
|
4/01/46 |
City returned control of
Weeks Tower to FAA. |
|
|
5/10/46 |
Weeks Tower commenced
operation by FAA, 1800 1000Z daily. |
|
|
5/16/46 |
Tower commissioned. |
|
|
5/18/46 |
E458 completely installed
and commissioned. Installed between 304 and 305 positions. |
|
|
6/05/46 |
Circuit 9892T commissioned. |
|
|
7/10/46 |
Circuit E458 commissioned. |
|
|
7/24/46 |
Weeks Tower hours of
operation 1700Z-09OOZ. |
|
|
9/13/46 |
Teletype installed ASA
Circuit 117T. |
|
|
9/20/46 |
Circuit 305 channels placed
in THV transmitter. Change‑over from THQ transmitter to the Circuit
304 THV of Circuit 305 frequencies and placing of Circuit 304 frequencies
in the THQ completed. (Except
for providing voice modulation on
Circuit 304 frequencies.) |
|
|
10/19/46 |
Channel 34, 6765 kc, Circuit
303X, commissioned. |
|
|
12/11/46 |
Airport tower
decommissioned. Center moved to communication station temporarily. |
|
|
12/24/46 |
Fire completely destroyed
Fairbanks Telephone Co. exchange, necessitating set up communications
circuits at Fairbanks to best advantage. |
|
|
3/04/47 |
Operation circuit 309
inaugurated. Remote keying of 199 kc 2610, 5065 kc, simultaneously at Ladd
Field, receiving 2 high frequencies on CW.
Receiving 199 on super pro receiver. |
|
|
3/29/47 |
PAA removed from Circuit
103T and placed on 110T. |
|
|
6/14/47 |
TLE transmitter commissioned
on 199 kc with power reduced to 4 kw. Due generator limitations. TLC
transmitter required only for standby on circuit 302X. |
|
|
6/27/47 |
Circuit 807 (Service F)
commissioned. |
|
|
7/31/47 |
Communications with Thule
terminated. |
|
|
6/18/47 |
Fire in construction
warehouse Fairbanks control site, damage confined to outside and
underneath portions. Estimate 33 1/3% damage.
Unknown origin. |
|
|
8/07/47 |
THV-1 transmitter
commissioned on Circuit 305 channels 52, 53 and 54. |
|
|
1/15/48 |
118/3 mc send/receive
commissioned at Weeks Field. |
|
|
9/23/48 |
Fairbanks Radio. Air/ground
transmitting and receiving facilities on 1674, 6537 and 9980 kc
discontinued. |
|
|
9/25/48 |
Automatic range monitoring
device commissioned. |
|
|
11/25/48 |
Automatic range monitoring
device decommissioned. |
|
|
11/01/49 |
Weeks Tower discontinued
guard on 6120 kc. |
|
|
11/01/49 |
Private teletype circuit
116T decommissioned at PAA. |
|
|
11/01/49 |
Circuit
115T. PAA Ladd Field, and PAA city
office added. |
|
|
11/03/49 |
Two high frequencies on
Circuit 301 discontinued. |
|
|
11/03/49 |
Inaugurated operation on Air
Force circuit 8335T. |
|
|
11/03/49 |
Local teletype circuit 11T
decommissioned. |
|
|
12/28/49 |
Wien Alaska Airlines drops
on 112F and 117F discontinued. Equipment removed. |
|
|
2/04/50 |
Circuit 112F and 117
decommissioned at Wien Alaska Airlines. |
|
|
3/25/50 |
Teletype service to Canadian
Pacific Airlines circuit 117 discontinued. |
|
|
4/25/50 |
Circuit 802 (B) and circuit
803 (A) commissioned. |
|
|
5/09/50 |
WBAS drop on circuit 251
discontinued. Circuit 251 decommissioned. |
|
|
5/26/50 |
Circuits 802 and 803
extended to Anchorage. |
|
|
5/29/50 |
Circuit 9119 placed in
standby status. |
|
|
7/22/50 |
Circuits 801T and 802T
combined, switching available. |
|
|
7/22/50 |
Circuits
301T commissioned utilizing former 801T line. |
|
|
7/30/50 |
Weeks
Tower begins 24‑hour operations. |
|
|
8/15/50 |
Service
A, circuit 303X decommissioned. |
|
|
8/30/50 |
Service
E, 121.5 mc commissioned. |
|
|
8/24/50 |
Circuit
8335 decommissioned. Circuit 111 reestablished. |
|
|
9/17/50 |
Apt.
Tower hours of operation will be 1600Z-0800Z. |
|
|
9/29/50 |
Circuit 301 decommissioned. |
|
|
9/29/50 |
Circuit 808 commissioned. |
|
|
9/30/50 |
Fairbanks
and Nome placed on receive/only basis on circuit 301. |
|
|
10/04/50 |
403
re-commissioned for traffic handling only. |
|
|
11/03/50 |
VHF 118.3
installed Weeks Field Tower. |
|
|
12/19/50 |
Circuit
9119 decommissioned. |
|
|
1/19/51 |
Receive/only drop
commissioned circuit 327T. |
|
|
2/01/51 |
Channels 52, 53 and 54
circuit 305 placed on standby. Channel 51, circuit 305 and circuit 309
combined. |
|
|
2/12/51 |
Circuit 808T decommissioned. |
|
|
2/15/51 |
Service ''B'' circuit 802T
commissioned. |
|
|
2/15/51 |
Security control position
commissioned (temporary) |
|
|
6/01/51 |
Airport control tower
commissioned 1600Z. Hours of operation 1600‑0800Z. International
Airport. Weeks Field Tower decommissioned 0800Z. |
|
|
6/05/51 |
International Express
Airport opened to all type of aircraft. |
|
|
6/07/51 |
FKS identifier assigned
Fairbanks International Airport. |
|
|
6/07/51 |
Outer marker compass locator
on 375 kc and middle marker compass locator on 215 kc commissioned. |
|
|
7/01/51 |
Airport Traffic Control
Tower at International Airport commissioned. |
|
|
8/27/51 |
Tower commenced 24-hour
operation. |
|
|
10/13/51 |
Alaska Airlines
decommissioned on circuit 117T. |
|
|
10/18/51 |
Weeks Tower burned down,
complete loss. |
|
|
11/19/51 |
Alaska Airlines commissioned
on circuit 115T. |
|
|
1/01/52 |
International Airport
identifier reverted to FAI. |
|
|
2/01/52 |
Non-directional radio
beacon, class NHW, ident. "FOX", frequency 356 kc commissioned. |
|
|
2/16/52 |
135.0 mc transmit
decommissioned. 135.9 mc transmit commissioned in ARTCC. |
|
|
2/21/52 |
ILS compass locator at outer
marker changed from FK to FA and that of the middle marker from KS to AI. |
|
|
3/29/52 |
Security control position
commissioned. |
|
|
6/01/52 |
Identification Eielson AFB
radio range changed from TSM to EAF. |
|
|
6/?/52 |
121.9 mc commissioned at
Fairbanks Tower. |
|
|
8/01/52 |
Frequency
Eielson AFB radio range changed from 308 to 287 kc. |
|
|
9/18/52 |
Frequency outer compass
locator ILS changed from 375 to 227. |
|
|
12/19/52 |
121.5 mc commissioned
International Airport Tower. |
|
|
1/26/53 |
Air/ground 1222.1, 122.2,
and 126.7 mc commissioned. |
|
|
3/27/53 |
ILS commissioned. |
|
|
1/05/54 |
Control area extended to
include Amber 2 to Bettles, Blue 27 to Kotzebue. |
|
|
3/01/54 |
Phillips Field fast line
decommissioned. |
|
|
10/14/54 |
International Tower
occupied. Moved from temporary structure. |
|
|
10/25/54 |
Combined FSS/Tower
commissioned. |
|
|
10/25/54 |
Circuit 11OF commissioned to
Tower. |
|
|
12/01/54 |
243 kc, 255.4 mc and 257.8
mc commissioned in the tower. |
|
|
3/31/55 |
3082.5 and 5037.5 kc circuit
E457 decommissioned. |
|
|
3/31/55 |
2973 and 5499 kc
commissioned on E457. |
|
|
3/31/55 |
2946 and 5672.5 circuit E458
decommissioned. |
|
|
3/31/55 |
2931 and 5544 kc
commissioned circuit E458. |
|
|
5/01/55 |
Combined facility
commissioned. |
|
|
5/01/55 |
Combined facility
commissioned. (Tower) |
|
|
6/03/55 |
3255 kc decommissioned. |
|
|
6/03/55 |
3253 kc commissioned. |
|
|
10/11/55 |
NE course LFR realigned
clockwise 178, and SW course to 005 magnetic. |
|
|
1/14/56 |
117T commissioned in CS/T. |
|
|
6/14/56 |
Interphone Circuit 296F to
Murphy Dome commissioned. (Tower) |
|
|
7/01/56 |
348.6 mc. Commissioned. |
|
|
4/02/57 |
Air-ground transmitting and
receiving facilities 8871 and 11356.5 kc commissioned. |
|
|
6/22/57 |
FAS interphone commissioned. |
|
|
8/08/57 |
248T extended to station
manager's office. |
|
|
10/04/57 |
Transmissometer and rotating
beam ceilometer commissioned by WBRAO. |
|
|
3/?/58 |
76.4 mc commissioned March
1958. |
|
|
3/01/58 |
6N11T decommissioned. |
|
|
7/25/58 |
ASA removed from 115T. |
|
|
8/09/58 |
118F decommissioned
completely. |
|
|
8/30/58 |
309T decommissioned. |
|
|
10/28/58 |
Decommissioned Service B
7917. |
|
|
10/28/58 |
Commissioned Service A
circuit 7915. |
|
|
12/01/58 |
Commissioned
receive‑only drop circuit 7913, Service A, in tower cab. |
|
|
2/24/59 |
Alder (ALE) MHW
commissioned. |
|
|
3/24/59 |
120.7 mc.
Commissioned. |
|
|
6/04/59 |
Model 28 printer installed
receive-only circuit 7913T. |
|
|
7/01/59 |
Control boundaries revised.
(See entry in Anchorage ARTCC of same date.) |
|
|
8/10/59 |
Wein Alaska City Office
decommissioned, teletypewriter circuit 115T. |
|
|
10/21/59 |
Type A approach lights
commissioned, Runway 19, Fairbanks International Airport. |
|
|
12/31/59 |
Telephone rearrangement completed. |
|
|
4/11/60 |
Glide path, middle marker,
middle compass locators, and localizer relocation outage. Expected to
return to service by January 1,1961. |
|
|
4/11/60 |
ALS shut down until November 1, 1960. |
|
|
4/23/60 |
Circuit 7915T decommissioned. |
|
|
6/
/60 |
VOR on test basis operating 108.2 mc. |
|
|
8/17/60 |
Service F circuit 240F decommissioned. |
|
|
8/17/60 |
Commissioned drop on
longline interphone circuit 7939F. |
|
|
8/22/60 |
Circuits 117T and 304
decommissioned. |
|
|
8/23/60 |
All operations
decommissioned at the Fairbanks teletypewriter horseshoe. All operations
confined to the tower cab in a commissioned status. Send/ receive Service
A 7913T and Service C 7918T commissioned in the WBAS. |
|
|
9/22/60 |
Circuit 9555V discontinued
including range voice control feature switch. |
|
|
10/19/60 |
Army operations added to
interphone circuit 2723F. Tower operations changed from Air Force to Army. |
|
|
11/08/60 |
Fairbanks ILS recommissioned
(080200Z). |
|
|
11/30/60 |
Fairbanks
ALS recommissioned (301930Z). |
|
|
|